ws atkins造句
- Mike Otlet of WS Atkins designed the stadium's retractable roof.
- Before founding his own consultancy, Nuseibeh worked with WS Atkins and Mouchel Parkman.
- The infrastructure upgrade was carried out by main contractor BAM Nuttall, in partnership with WS Atkins.
- In 1996, WS Atkins was admitted to the London Stock Exchange and began trading as WS Atkins plc.
- In 1996, WS Atkins was admitted to the London Stock Exchange and began trading as WS Atkins plc.
- In the late 1990s WS Atkins worked on the Burj al Arab hotel, which was completed in 1999.
- He has been appointed to join the board of WS Atkins as a non-executive director effective 9 September 2011.
- The original company, WS Atkins & Partners, was established by the late town planning, engineering sciences, architecture and project management.
- The Mall has a total floor space of 5, 00, 000 sq ft spread over 5 floors designed by designing firm WS Atkins.
- The seven star hotel was designed by WS Atkins PLC . The newly built Islamabad Stock Exchange Towers is another example of modern architecture in the city.
- It's difficult to see ws atkins in a sentence. 用ws atkins造句挺难的
- The Est醖io Algarve was designed in the summer of 2000 to UEFA and FIFA standards by Damon Lavelle of WS Atkins engineers and local partners including Marobal.
- The stadium was designed by a team led by Rod Sheard at Lobb Sport Architecture, who later merged with Laing and the structural engineers were WS Atkins.
- WPD say that the drain-down is required as a result of a statutory inspection carried out by WS Atkins PLC . But the Environment Agency have disagreed.
- The parties to the PFI contract are Alfred McAlpine ( builders ), WS Atkins ( maintenance ), Sodexho ( hotel services ) and Innisfree Ltd ( equity ).
- Faced with a growing water shortage, the Philippine government is considering an offer by Britain's WS Atkins Ltd . to build a $ 1 billion dam outside Manila.
- In 2013 PKP appointed Ernst & Young and WS Atkins to undertake a feasibility study for an EU-supported modernisation of the station, planned for in 2013-15.
- Under the proposal, the WS Atkins consortium would build a dam on the Kaliwa River in Rizal province to provide water to the capital and the booming industrial regions to the south.
- WS Atkins is leading a consortium that includes Philipp Holzman AG of Germany, Biwater International Ltd . of the U . K . and Hanjin Engineering and Construction Co . of South Korea.
- In 1938 he established WS Atkins as an engineering consultancy, severing his connections with " London Ferro-concrete " in 1950 when it was bought by a new management team.
- "This means that the water shortage in Metro Manila can be completely settled by mid-1998, if the construction starts within this year, " said WS Atkins Chairman Terrel Wyatt.